2月19日,OMA宣布赢得法国北部里尔市法院大楼竞赛。项目拟于2023年建成,将用作里尔市高院及地区法院办公地。继1989年Euralille新区计划和1994年Congrexpo会议展示中心后,OMA再返里尔。
新立法大楼坐落于里尔市郊,临近沃邦设计的前防御工事。为更好地回应此基地,回应里尔市过去与当下的一系列不同元素,OMA设计了一座多彩、多面的建筑。大楼底部是公共、主要的法庭,一座三角形塔楼升起于其中。
立法大楼的内部设计旨在让司法程序更加开放、透明,减少传统法院的压迫感。本方案的设计由艾伦·范·龙与雷姆·库哈斯领导,项目由OMA与Saison Menu、WSP、BMF、Quadrim合作完成,拟于2023年完工。
Lille, February 19, 2018 - OMA’s design for the new Palais de justice in Lille has been selected as the winner of four finalists from a competition. The new public building, commissioned by the Ministry of Justice, will accommodate the high court and district court of Lille. With the design of the new courthouse, OMA retus to Lille more than twenty years after designing the masterplan for the new Euralille district (1989) and the conference and exhibition centre Congrexpo (1994).
Lille’s new courthouse will be built near Vauban’s former fortifications at the outskirts of the city. Triggered by this location, OMA has designed a colorful multifaceted building that is able to address a wide range of different elements from the city’s past and present. From the base of the building, which houses the public and the major courtrooms, a central triangular tower rises where all the minor courtrooms are concentrated.This tower is surrounded by a ring of offices floating above the base.
The interiors of each of the building’s components are conceived to make all the procedures of justice accessible, even inviting, free of the intimidation that has traditionally been the main characteristic of the architecture of justice.
OMA’s design team is led by Ellen van Loon and Rem Koolhaas. The project is developed in collaboration with Saison Menu, WSP, BMF and Quadrim. Completion is scheduled for 2023.
版权声明:本文由OMA授权有方空间发布,欢迎转发,禁止转载。
上一篇:独立与亲密共存:扬中市三环幼儿园 / 普泛建筑工作室
下一篇:最幸运的普通人:两座尤松尼亚住宅