设计单位 ARM architecture
项目地点 澳大利亚黑德兰
建成时间 2012年6月
建筑面积 4500平方米
体育馆的名字在当地的kariyarra语言中寓意为“旋风”。澳大利亚事务所ARM architecture为当地设计了一处面积为4500平方米的体育设施,包括了室内外的运动场馆和活动空间。
Meaning ‘whirlwind’ in the local kariyarra language, the ‘wanangkura stadium’ in hedlend by australian practice ARM architecture provides a 4,500 m2 facility complete with indoor and outdoor athletic venues and event spaces.
该项目坐落于名为“凯文·斯科特椭圆区”的城郊社区。就如这个名字般,社区被富有生机的红土地和强烈的气旋所环绕,游客通常依靠飞机才能到达此地。
The project is located in ‘Kevin Scott oval’, an appropriately-named suburban neighborhood typically reached by air, surrounded by vibrant red soil and extreme cyclonic climatic conditions.
彩色的立方体结构成为这处巨型运动场的一大特色,这些立方体的单元带有蕴含地域风情的色彩,同橙色的自然景观形成了鲜明的对比。
The massive recreational facility features a colored cube construction with toned pixels that boast the local team’s colors and create a strong contrast to the naturally orange landscape.
在这种设计下,屋顶也可以被认为是另一个“立面”,因为很多游客是乘坐飞机而不是通过陆路来到此地的。从远处望向建筑,立面的纹理创造出形似海市蜃楼般的效果,也成为这座小镇的一处标志。
The roof in this case was also considered another facade, as many of the visitors arrive by plane than by land. From a distance, the facade texture creates a mirage-like effect and an iconic symbol for the small town.
主楼包括了室内篮球、羽毛球、排球、足球和壁球的场地,此外还设有一处健身房、供当地团队使用的俱乐部活动室、多功能厅和供400人使用的可伸缩座椅,建筑物周围还有户外篮球场。
The main building contains indoor basketball, badminton, volleyball, soccer/football and squash courts, a gym, club rooms for local teams, multi-function halls, and retractable seating for 400 people, with outdoor arenas for netball and basketball adjacent to the structure.
在朝向椭圆区的一侧,有一处看台和更衣室,将在比赛期间为运动员和访客们提供服务。
On the side facing the oval, a spectator’s stand changing rooms and suites service the players visitors during game-play.
建筑依托于混凝土板和钢架系统完成建造,热绝缘性极高的墙壁令建筑在极端天气下仍能保持舒适的温度,这也减轻了电网的负荷。
The building rests on a concrete pad and steel frame system with highly insulated walls that maintain comfortable temperatures during extremeweather conditions, which also lightens the load on grid energy.
模块化的玻璃幕墙为制作和更换提供了便利,东侧入口处的立面处集成了LED灯具,以在夜间提供照明。经济性较好的墙板被漆成所需的颜色以用于内部的装饰,在板材后面设有通风孔,以调控室内的空气质量。
The modular vitreous facade panels are easily fabricated and replaced, with integrated LED lights in the eastern entrance facade for night-time illumination. Economical ply wall panels are stained to desired colors and make up the interior material, with a ventilated cavity behind assuring quality air control.
设计图纸 ▽
完整项目信息
project name: wanangkura stadium
architecture practice: arm architecture
date of completion: july/2012
category: public buildings ‐ sporting
total project cost: $35 million
gross floor area (m2): 4,500m2
type of building contract: lump‐sum contract
project address: hamilton rd; south hedland, wa 6721
owner/client: town of port hedland
practice team: howard raggatt, andrew lilleyman, sophie cleland, rhonda mitchell, tim pyke, sarah lake, jenny watson
consultant/ construction team role:
landscape architecture: oculus
structural & services: aurecon
quantity surveyor: davis langdon / rider levett bucknell
building surveyor: john massey group
builder: doric group
参考资料:
https://www.designboom.com/architecture/foster-partners-guangming-hub-china-11-20-2020/
本文由有方编辑整理,欢迎转发,禁止以有方编辑版本转载。图片除注明外均源自网络,版权归原作者所有。若有涉及任何版权问题,请及时和我们联系,我们将尽快妥善处理。联系电话:0755-86148369;邮箱info@archiposition.com
上一篇:上海永嘉路口袋广场:廊下日常 / 阿科米星
下一篇:上海长江斯迈普电梯厂区改造:“悬浮”的拱形序列 / ATAH介景建筑